ID |
原文 |
译文 |
513 |
1 Greening space rate in the community is not less than 35%; |
1 住区绿地率不小于35%; |
514 |
1 Greening space rate in the new community shall not be less than 30%; |
1 新区建设绿地率不低于30%; |
515 |
1 Ground gradient of ramp entrance shall not be greater than 1∶20; where site conditions are relatively better, it should not be greater than 1∶30; |
1 平坡出入口的地面坡度不应大于1∶20,当场地条件比较好时,不宜大于1∶30; |
516 |
1 Ground of pedestrian passageway at station square shall be flat, smooth, non-slip and free from accumulated water, wheelchair ramp shall be provided with if height difference exists; |
1 站前广场人行通道的地面应平整、防滑、不积水,有高差时应做轮椅坡道; |
517 |
1 Ground of underlying rock bed with relatively large surface gradient; |
1 下卧基岩表面坡度较大的地基; |
518 |
1 Ground resistance shall be inspected; if it does not conform to the design requirements, debugging by powering on shall not be started; |
1 应检查接地电阻,如不符合设计要求不得通电调试; |
519 |
1 Group control function shall be provided where multiple elevators are arranged centralized; |
1 多台电梯集中排列时,设置群控功能; |
520 |
1 Gutter at expansion joint or settlement joint of buildings shall be arranged with deformation seam correspondingly. |
1 房屋的伸缩缝或沉降缝处的天沟应对应设置变形缝。 |
521 |
1 HDTV refers to high distinctness television, R9 shall be greter than 0. |
1HDTV指高清晰度电视;其特珠显色指数R9应大于零; |
522 |
1 Hammering method shall be adopted to inspect the compactness of core column concrete of small block masonry; core drilling method or ultrasonic method may also be adopted for inspection; |
1 对小砌块砌体的芯柱混凝土密实性,应采用锤击法进行检查,也可采用钻芯法或超声法进行检测; |