ID |
原文 |
译文 |
383 |
1 Fabrication length of steel wires when heading anchor is used; |
1 采用镦头锚时的钢丝下料长度; |
384 |
1 Failure or excessive deformation of the structure or structural member (including the foundation), for which the strength of materials of the structure is critical; |
1 结构或结构构件(包括基础等)的破坏或过度变形,此时结构的材料强度起控制作用; |
385 |
1 Fan, air valve and water valve shall be able to be started/stopped through interlocking control; |
1 应能进行风机、风阀和水阀的启停连锁控制; |
386 |
1 Fatigue action of steel structure |
1 钢结构疲劳作用 |
387 |
1 Fatigue resistance of steel structure |
1 钢结构疲劳抗力 |
388 |
1 Final screwing color mark shall be inspected and a 0.3kg hammer shall be used to knock the nut for inspecting the high strength bolt one by one; |
1 应检查终拧颜色标记,并应用0.3kg重小锤敲击螺母对高强度螺栓进行逐个检查; |
389 |
1 Final screwing color mark shall be inspected and an about 0.3kg hammer shall be used to knock the nut for inspecting the high strength bolt one by one; |
1 应检查终拧颜色标记,同时应用约0.3kg重小锤敲击螺母对高强度螺栓进行逐个检查; |
390 |
1 Fine aggregate should adopt medium granular sand in Area Ⅱ . |
1 细骨料宜选用Ⅱ区中砂。 |
391 |
1 Finished cooling tower shall be of high cooling efficiency, little water drift and low noise. |
1 成品冷却塔应选用冷效高、飘水少、噪声低的产品; |
392 |
1 Firstly, single machine power-on inspection shall be carried out for the device and equipment one by one (including alarm controller, linkage control panel, fire broadcasting, etc. .); when the device and equipment are normal, system inspection may be carried out; |
1 应先分别对器件及设备逐个进行单机通电检查(包括报警控制器、联动控制盘、消防广播等),正常后方可进行系统检验; |