ID |
原文 |
译文 |
243 |
1 Cables should be inspected before laying to check if there is any damage on its surface. |
1 电缆敷设前应查看电缆外表面有无损伤。 |
244 |
1 Calculate the jacking force and elongation of prestressing tendons; determine the readings of oil pump pressure gauge according to the calibration results of tensioning device; |
1 计算张拉力和张拉伸长值,根据张拉设备标定结果确定油泵压力表读数; |
245 |
1 Calculated length coefficient of single-section column with constant section may take 1.0; |
1 等截面单段柱的计算长度系数可取1.0; |
246 |
1 Calculation method of integrated part load value (IPLV) shall meet the requirements of article 4.2.13 in this standard; |
1 综合部分负荷性能系数(IPLV)计算方法应符合本标准第4.2.13条的规定; |
247 |
1 Calculation of the eccentric compression load: |
1 偏心受压荷载计算: |
248 |
1 Capable of being opened and locked independently; where screen doors are arranged on the platform, they shall be capable of being opened and locked in linkage with the screen doors. |
1 能单独开闭和锁闭;在站台设有屏蔽门时,能与屏蔽门联动开闭。 |
249 |
1 Ceiling loadspeakers in the same room shall be arranged uniformly. |
1 同一室内的吸顶扬声器应排列均匀。 |
250 |
1 Centralized monitoring and management of the full line fire protection. |
1 实现全线消防集中监控管理。 |
251 |
1 Certified cement and admixture; |
1 获得认证的产品; |
252 |
1 Certified rebar and fabricated rebar; |
1 获得认证的钢筋、成型钢筋; |