ID 原文 译文
106772 in a truss, the bars are joined together by hinges at all the connections; in frames, all the joints are fixed and entirely stiff. 平面桁架和框架 平面桁架和框架是位于平面内的平面结构(见图9.1)。
106773 indirect costs of loss—inability to meet contracts, loss of market share, loss of goodwill, poor industrial relations, poor workplace morale, recruitment problems, adverse press relationship. Risk Management 损失的间接成本——无能力履行合同,市场份额的损失,声誉的损失,劳资关系变差,工作士气变差,招募新职员问题,不利的压力关系。
106774 industrial—warehouses, factories, land in industrial districts, and power plants; 工业地产——仓库,工厂,工业区用地和发电厂;
106775 instil confidence in the project, in third parties, and in the project team itself; 在项目,第三方以及项目团队中渗透信心;
106776 job safety standards; 工作安全标准;
106777 latent defects occurring in the structure through poor workmanship; 操作工艺低劣导致结构存在潜在的缺陷;
106778 measurable consequential costs of loss—loss of, or reduced output, knock-on effect on production chain, losses whilst retraining replacement staff or becoming familiar with replacement equipment, accident investigation costs, lost management time involved in litigation, increased premiums; 损失产生的可测量间接成本——产量的损失或减少,对生产线的冲击作用,损失所带来的新职员的再培训,熟悉替换设备,事故调查成本,参与诉讼损失的管理时间以及增加的额外费用。
106779 order of magnitude estimates 初步估算;
106780 organization of a safety program; 安全计划的组织;
106781 promote an uninterrupted progression of the activities within a project and, by implementing the appropriate measures, remove any interruptions as quickly as possible should they occur; 风险管理可以:◆ 在项目中促进活动不间断的前进,通过执行恰当的措施,在它们发生时尽可能快的消除任何障碍;