ID |
原文 |
译文 |
106702 |
□ provide demonstrable evidence of top management support. |
□ 提供最高管理者支持的明确的证明。 |
106703 |
◆ Being struck by falling tools, work materials, or debris; and |
◆ 被坠落的工具、材料或碎片等击中; |
106704 |
◆ Budget estimate for financing |
◆ 为资金筹措编制的预算性估算; |
106705 |
◆ Budgeted cost after contracting but prior to construction |
◆ 签订合同后,施工前的成本预算; |
106706 |
◆ Cobbles or portion of the coarse aggregate, however may be added last. |
◆ 而卵石或部分粗骨料可以最后加入。 |
106707 |
◆ Collapse of the scaffold, caused by instability or overloading; |
◆ 由于结构不稳定或超载引起的脚手架倒塌; |
106708 |
◆ Combination of friction and cohesion piles. |
◆ 摩擦、黏聚力复合桩。 |
106709 |
◆ Complexity of projects using high grade materials. |
◆ 高质量标准;◆ 保证工期的重要程度; |
106710 |
◆ Composite piles. Timber piles. |
◆ 复合桩。 |
106711 |
◆ Concrete; |
◆ 混凝土桩; |