ID |
原文 |
译文 |
102248 |
When consulted on which architect should be solicited for the task, Canon Ledeur, Secretary of the Besançon Commission d'Art Sacré, immediately put forward Le Corbusier's name. |
当商量应恳请哪位建筑师来完成任务时,贝桑松(Besançon)宗教艺术委员会的干事勒德尔教士立刻提出了勒˙柯布西耶的名字。 |
102249 |
When corrosion of the reinforcement occurs it results in a loss of steel section and/or cracking, spalling and delamination of the concrete due to the stresses produced as a result of the low density of rust compared with density of the steel. |
当钢筋发生腐蚀时,会导致钢截面的损失和(或者)断裂,使混凝土产生剥落和分层,这也可能是由于铁锈的密度比刚的密度低而产生应力所引起。 |
102250 |
When cutting employment, the employing unit shall continue to employ the following persons by giving priority to them: |
裁减人员时,应当优先留用下列人员: |
102251 |
When design is completed, it is important that contract prices be based on adequate estimating detail. |
当用网络图来描述一个项目时,既可以使用箭头符号也可以使用圆圈符号。 |
102252 |
When design is completed, it is important that contract prices be based on adequate estimating detail. |
当设计完成后,重要的一点是合同价格要基于充分的估算细节。 |
102253 |
When designating his Forty Views, Qianlong called the Fairy's Islet the Immortal Abode on the Fairy Terrace (Pengdao Yaotai). |
乾隆为四十景取名的时候,就把这座蓬莱洲命名为"蓬岛瑶台"。 |
102254 |
When designating his Forty Views, Qianlong called the Fairy’s Islet the Immortal Abode on the Fairy Terrace (Pengdao Yaotai). |
乾隆为四十景取名的时候,就把这座蓬莱洲命名为“蓬岛瑶台”。 |
102255 |
When designing a floor heating system, however, low air temperature may be acceptable because of the higher level of overall radiation and the added benefit of conduction from warm, friendly floors. |
在设计地板辐射供热系统时,由于全面辐射程度较高以及温暖便利的地板导热,较低的空气温度也是可以接受的。 |
102256 |
When determining each extension of time under Sub-Clause 20.1, the Employer shall review previous determinations and may increase, but shall not decrease, the total extension of time. |
雇主每次按照第20.1款确定延长时间时,应对以前所作的确定进行审核,可以增加,但不得减少总的延长时间。 |
102257 |
When determining each extension of time under Sub-Clause 20.1, the Engineer shall review previous determinations and may increase, but shall not decrease, the total extension of time. |
当依据第20.1款确定每一延长时间时,工程师应复查以前的决定并可增加(但不应减少)整个延期时间。 |