ID 原文 译文
83 00m. If less than 2.00m, width of protruding part shall not be greater than 100mm; if protruding part is greater than 100mm, its height from the ground shall be less than 600mm; 4 固定在无障碍通道的墙、立柱上的物体或标牌距地面的高度不应小于2.00m;如小于2.00m时,探出部分的宽度不应大于100mm;如突出部分大于100mm,则其距地面的高度应小于600mm;
84 0n the basis of this, the paper puts forward assembled mode, PMC +Partnering project management mode, and through the comparison of assembled mode and traditional mode, points out the value of using the assembled mode. 在此基础上,提出了工程项目管理的组合模式PMC-Partnering项目管理模式,通过组合模式与传统模式的比较,指出组合模式应用的价值。
85 0n the choice of management modes of engineering project in our country, popularizing PMC mode is proposed. Meanwhile, the question and insufficient effects that PMC exists in the present stage are pointed out. 在我国工程项目管理模式的选择上,建议推广PMC模式,同时指出现阶段PMC存在的问题和不足。
86 1 0. 5MΩ for power circuits and electric safety device circuits; 1 动力电路和电气安全装置电路:0.5MΩ;
87 1 0. 5MΩ for power circuits and electrical safety device circuits; 1 动力电路和电气安全装置电路0.5MΩ;
88 1 0.05 may be taken for the enclosed building; 1 封闭式房屋可取0.05;
89 1 0.75 wind load coefficient in open building is applicable to any covering surface of building surface; 1 敞开式房屋中的0.75风荷载系数适用于房屋表面的任何覆盖面;
90 1 1 φ6 steel tie shall be set for every 120mm-thick wall; where the wall thickness is 120mm, 2φ6 steel tie shall be set; 1 每120mm墙厚应设置1φ6拉结钢筋;当墙厚为120mm时,应设置2φ6拉结钢筋;
91 1 120mm-thick wall, dry wall, dressed stone wall, insulated column and attached column; 1 120mm厚墙、清水墙、料石墙、独立柱和附墙柱;
92 1 180kg/m3 is taken for the Northeast China and northern Xinjiang; 1 东北及新疆北部地区取180kg/m3;