ID |
原文 |
译文 |
813 |
1 Select one span close to middle section in case of tightening section at 5 spans or below; |
1 紧线段在5档及以下时靠近中间选择一档; |
814 |
1 Self-compacting concrete placement should be adopted; |
1 宜采用自密实混凝土浇筑; |
815 |
1 Self-inspection, mutual inspection and handover inspection shall be carried out for each procedure according to process requirements; |
1 各工序按工艺要求,应自检、互检和交接检; |
816 |
1 Shall be able to control the switching of different kinds of image signals on various display equipment; |
1 应能控制不同种类图像信号在各类显示设备上的切换; |
817 |
1 Shall be able to display different kinds of image signals required by the design on various display equipment; |
1 应能在各类显示设备上显示设计要求的不同种类的图像信号; |
818 |
1 Shall be able to play multichannel audio signals; |
1 应能播放多路音频信号; |
819 |
1 Shall determine the quality objective; |
1 应确定质量目标; |
820 |
1 Shall establish safety management organization; |
1 应建立安全管理机构; |
821 |
1 Shall not influence the size and shape of underground structure and the normal construction; |
1 不得影响地下结构尺寸、形状和正常施工; |
822 |
1 Shall possess special hydro-geological survey data, survey report for surroundings and insite pumping test data; |
1 应具备专门的水文地质勘察资料、基坑周边环境调查报告及现场抽水试验资料; |