6682 |
3 Tensioned rod and brace rod between purlins should directly connect to purlin web and adopt ordinary bolt connection (Figure 9.1.10-3a), and the diagonal tensioned rod ends should be buckled or arranged with cushion block (Figure s 9.1.10-3b and 9.1.10-3c). |
3 檩条之间的拉条和撑杆应直接连于檩条腹板上,并采用普通螺栓连接(图9.1.10-3a),斜拉条端部宜弯折或设置垫块(图9.1.10-3b、图9.1.10-3c)。 |
6683 |
3 Test block result is regarded as dependence for casting of concrete or mortar with strength test. Test block as one set shall be made from each foundation; |
3 对浇灌混凝土或砂浆的强度检验应以试块为依据,试块的制作应每基取一组; |
6684 |
3 Test report and testing records in strength grade and compactness of all layers; |
3 各层的强度等级、密实度等的试验报告和测定记录; |
6685 |
3 Test report should be completed at test site and shall be timely reviewed, signed, stamped as well as recorded and archived. |
3 试验报告宜在试验现场完成,并应及时审核、签字、盖章、登记归档。 |
6686 |
3 The 7th day to the end of temperature measuring: at least once for every 12h. |
3 第七天至测温结束,每12h不应少于一次。 |
6687 |
3 The Buckling Restrained Brace shall be installed according to requirements of the design document and product instruction. |
3 屈曲约束支撑应按设计文件和产品说明书的要求进行安装。 |
6688 |
3 The K value of carbon fiber shall be judged according to Appendix M of this code. |
3 碳纤维的K数应按本规范附录M判定。 |
6689 |
3 The acceptance of strengthening engineering quality shall be carried out based on the qualified inspection and evaluation by the construction organization itself; |
3 加固工程质量的验收应在施工单位自行检查评定合格的基础上进行; |
6690 |
3 The access hole of the pipe ditch for heating and cable trench. |
3 采暖管沟和电缆沟的检查孔。 |
6691 |
3 The active equipment shall be inspected by power on to confirm the equipment being normal. |
3 有源设备应通电检查,确认设备正常。 |