ID 原文 译文
6502 3 Lightning protection and grounding engineering construction shall meet the relevant requirements of Chapter 16 in this code. 3 防雷与接地工程施工应符合本规范第16章的相关规定。
6503 3 Liquid admixtures shall be kept in dry, shady and cool place, prevented from insolation, pollution and immersion and shall be stirred uniformly before use; the liquid admixtures with any segregation or color changing shall be used after qualified by test. 3 液体外加剂应放置于阴凉干燥处,应防止日晒、污染、浸水,使用前应搅拌均匀;有离析、变色等现象时,应经检验合格后再使用。
6504 3 Loading and boundary condition of specimen shall be close to the actual service state of the member. 3 试件的模拟加载边界条件,应接近构件的实际工作状态。
6505 3 Loading contents of words and image, debug and detect each terminal which shall correctly display the released content; 3 加载文字内容、图像内容,调试、检测各终端机应正确显示发布的内容;
6506 3 Location map of accessible facilities and accessibility tourist map shall be arranged at entrance; 3 出入口应设置无障碍设施位置图、无障碍游览图;
6507 3 Locations of concrete pumps shall satisfy the construction requirements and the site shall be level and compact; the road shall be unobstructed; 3 输送泵设置的位置应满足施工要求,场地应平整、坚实,道路应畅通;
6508 3 Locking strength at both sides (at normal position and at reverse position) of external locking shall meet relevant technical requirements. 3 外锁闭两侧(定位、反位)的锁闭量应符合相关技术要求。
6509 3 Low contact electric resistance. 3 接触电阻低。
6510 3 Low requirements for building grade and function. 3 建筑等级和功能要求较低。
6511 3 Luminaires and their accessories shall be complete and adaptive and free from the defects such as damage, deformation, coat peeling, lampshade cracking; 3 灯具及其附件应齐全、适配,并无损伤、变形、涂层剥落和灯罩破裂等缺陷;