ID |
原文 |
译文 |
6392 |
3 Ground hydrated lime shall not be directly used in mortar. |
3 消石灰粉不得直接用于砂浆中。 |
6393 |
3 Ground with mass boulder or individual exposed clint. |
3 大块孤石或个别石芽出露的地基。 |
6394 |
3 Grounding level inclination of guy line allowance deviation is 1°; |
3 拉线的对地水平夹角允许偏差为1°; |
6395 |
3 Handing-over inspection is carried out between relevant professions and work types; |
3 相关各专业工种之间进行交接检验; |
6396 |
3 Handrail shall be arranged at a height of 850mm~900mm on three walls of elevator car and shall meet relevant requirements of Section 3.8 of this code; |
3 轿厢的三面壁上应设高850mm~900mm扶手,扶手应符合本规范第3.8节的相关规定; |
6397 |
3 Handrail shall be arranged on both sides of stairway with three steps or above; |
3 三级及三级以上的台阶应在两侧设置扶手; |
6398 |
3 Heat supply of central heating system; |
3 集中供热系统的供热量; |
6399 |
3 Height of the towel rack shall not be greater than 1.20m. |
3 毛巾架的高度不应大于1.20m。 |
6400 |
3 High performance water reducer should be adopted. |
3 宜采用高性能减水剂。 |
6401 |
3 High strength grade concrete should be cast first before the low strength grade concrete. |
3 宜先浇筑强度等级高的混凝土,后浇筑强度等级低的混凝土。 |