ID |
原文 |
译文 |
5406 |
2. The application of BIM in construction project management |
2. BIM在建筑工程管理中的应用研究 |
5407 |
2. The design working life of foundation shall not be less than that of building structure; |
2.地基基础设计使用年限不应小于建筑结构的设计使用年限; |
5408 |
2. The idea of construction project integrated management on life cycle, integrated management in every procedure of construction project is proposed. Through full and complete communication among the procedures, the all life cycle is integrated into a unit. |
2 .提出全生命周期集成即工程项目生命周期的各个阶段的集成的思想,将项目实施的各个阶段各个环节之间通过充分的信息交流集成为一个整体。 |
5409 |
2. f… is taken as the design value of the strength of the butt weld in the bending and compression area, while f. |
2 对接焊缝抗弯受压区强度设计值取f… |
5410 |
2. updating building envelope thermal performance limits and cooling source energy efficiency limits, and making requirements respectively according to building classification and building thermal zones; |
2.更新了围护结构热工性能限值和冷源能效限值,并按建筑分类和建筑热工分区分别作出规定; |
5411 |
2.0.1 Automatic train control, system |
2.0.1 列车自动控制(ATC) |
5412 |
2.0.1 Building engineering |
2.0.1 建筑工程 |
5413 |
2.0.1 Building ground |
2.0.1 建筑地面 |
5414 |
2.0.1 Concrete structure |
2.0.1 混凝土结构 concrete structure |
5415 |
2.0.1 Concrete structure |
2.0.1混凝土结构 |