ID |
原文 |
译文 |
4966 |
2 Through-wall steel tie should be arranged like cinquefoil; and the through-wall reinforcement shall be arranged in header for single-side combination ring beam or in header joint for double-side combination ring beam. |
2 穿墙拉结钢筋宜呈梅花状布置,穿墙筋位置应在丁砖上(对单面组合圈梁)或丁砖缝(对双面组合圈梁)。 |
4967 |
2 Time adjustment of train stop at stations. |
2 车站停站时分调整。 |
4968 |
2 Touch-sound integrated information service facilities should be provided for people with visual disability; |
2 宜为视觉障碍者提供触摸及音响一体化信息服务设施; |
4969 |
2 Toxic and harmful wastes, like used battery and used ink box, shall be recycled in an enclosed manner and shall not be placed in a mixed way. |
2 废电池、废墨盒等有毒有害的废弃物应封闭回收,不应混放。 |
4970 |
2 Traffic distribution square. |
2 交通集散广场。 |
4971 |
2 Traffic lane and parking area of underground garage; |
2 地下车库的行车道、停车位; |
4972 |
2 Train detaining and terminal station train stop. |
2 扣车及停站终止等。 |
4973 |
2 Train number triggered route. |
2 车次号触发进路。 |
4974 |
2 Train operation tests of main track routes. |
2 正线进路的行车试验。 |
4975 |
2 Transfer stations at multi-line parallel platforms of the same floor: between platforms. |
2 多线同层站台平行换乘车站:站台与站台之间。 |