ID |
原文 |
译文 |
4376 |
2 Shall not be less than 30MPa where stress-relieved steel wire or steel strand is adopted as the pre-tensioned members of prestressed tendon. |
2 对采用消除应力钢丝或钢绞线作为预应力筋的先张法构件,不应低于30MPa。 |
4377 |
2 Shall not influence the serviceability of existing pile foundation; |
2 不得影响既有桩基的正常使用; |
4378 |
2 Shall organize design clarification, survey the construction site, transact negotiation on technical alteration and determine the construction method; |
2 应组织设计交底、查勘施工现场、办理技术变更洽商、确定施工方法; |
4379 |
2 Shallowly imbedded hopper and karst trough, etc. with filling of soft soil; |
2 漏斗、溶槽等埋藏浅,其中充填物为软弱土体; |
4380 |
2 Shear bonding strength and its failure mode; |
2 剪切粘结强度及其破坏形式; |
4381 |
2 Shear structure member: for the brick masonry, the strength grade of the existing masonry mortar should be greater than or equal to M1; however, if it is low-rise buildings, it is permissible to be greater than or equal to M0. |
2 受剪构件:对砖砌体,其原砌筑砂浆强度等级不宜低于M1;但若为低层建筑,允许不低于M0.4。 |
4382 |
2 Sheath for unbonded prestressing steel strand shall be smooth, free from crack and obvious fold; slightly damaged part shall be enveloped with waterproof plastic adhesive tape for repairing, badly damaged part shall not be allowed. |
2 无粘结预应力钢绞线护套应光滑、无裂缝,无明显褶皱;轻微破损处应外包防水塑料胶带修补,严重破损者不得使用。 |
4383 |
2 Side-lighting arrangement: The floodlights are positioned on both sides of the area and the lighting is not perpendicular to the competition area. |
2 两侧布置:灯具布置在场地两侧,光束非垂直于场地平面; |
4384 |
2 Signal control. |
2 信号机控制。 |
4385 |
2 Signal intensity and signal quality on satellite receiver shall reach the degree position with strongest signal; |
2 卫星接收机上的信号强度和信号质量应达到信号最强的位置; |