ID |
原文 |
译文 |
4196 |
2 Lime putty shall not be frozen and frozen lime paste shall be used after it is melted; |
2 石灰膏应防止受冻,当遇冻结,应经融化后方可使用; |
4197 |
2 Lime putty stored in the sedimentation tank shall be prevented from dryness, freezing and contamination. Do not use dehydrated and hardened lime putty; |
2 沉淀池中贮存的石灰膏,应防止干燥、冻结和污染,严禁使用脱水硬化的石灰膏; |
4198 |
2 Limit damage tolerance-based method |
2 极限损伤度法 |
4199 |
2 Limits of transverse wide to span ratioand horizontal displacement of the bridge span structures and limit of transverse vibration frequency of the whole bridge; |
2 桥跨结构横向宽跨比限值、横向水平变位限值和桥梁整体横向振动频率限值; |
4200 |
2 Line-demarcating positions of prestressed rods; |
2 画线标定预应力撑杆的位置; |
4201 |
2 Linear interpolation may be used for the distance from the roofs to the furnace between the values listed in the table. |
2 当邻近建筑屋面离高炉距离为表内中间值时,可按插入法取值。 |
4202 |
2 Lintel should be arranged on the top of temporary construction opening; the upper part of the opening may also be sealed through layer-by-layer brick oversailing, and horizontal tie bar shall be embedded; |
2 临时施工洞口顶部宜设置过梁,亦可在洞口上部采取逐层挑砖的方法封口,并应预埋水平拉结筋; |
4203 |
2 Live load during the construction shall include construction loading and weight of operators and small tools; and its characteristic value may be calculated according to actual conditions; |
2 施工活荷载应包括施工堆载、操作人员和小型工具重量等,其标准值可按实际计算; |
4204 |
2 Load Code for the Design of Building Structures GB 50009 |
2 《建筑结构荷载规范》 GB 50009 |
4205 |
2 Load testing-based or field testing-based method may be used if it is possible; |