ID |
原文 |
译文 |
3916 |
2 Equipment installed in cabinet shall be with ventilation and heat dissipation measures, and the connection between the internal connectors and equipment shall be firm; |
2 机柜内安装的设备应有通风散热措施,内部接插件与设备连接应牢固; |
3917 |
2 Equipment operation state is suggested to be tested and alarmed for malfunction; |
2 对设备运行状态宜进行检测及故障报警; |
3918 |
2 Equipment shall be firmly installed; |
2 设备安装应牢固; |
3919 |
2 Erect safe and reliable platform for tendons stressing operation according to requirements of projects; |
2 根据工程需要搭设安全可靠的张拉作业平台; |
3920 |
2 Escalators shall have definite marks for their operation directions. |
2 自动扶梯应有明确的运行方向指示。 |
3921 |
2 Evaluation method based on partial factor or lumped safety factor; |
2 基于分项系数或安全系数的评定方法; |
3922 |
2 Evaluation sheet for green construction factor shall be filled in according to format specified in Table 11.3.1-1. |
2 绿色施工要素评价表应按表11.3.1-1的格式进行填写。 |
3923 |
2 Every (3~4) constructed courses should be one layer height and every layer height shall be leveled once; |
2 每砌(3~4)皮宜为一个分层高度,每个分层高度应找平一次; |
3924 |
2 Executing the tunnel smoke control mode after receiving the information on locations of fire and train stop at the sections. |
2 接收列车区间停车位置、火灾部位信息,执行隧道防排烟模式。 |
3925 |
2 Execution of disaster-prevention and blocking modes. |
2 执行防灾和阻塞模式。 |