ID |
原文 |
译文 |
3906 |
2 Energy efficient building assessment shall be carried out when the applicable indoor environment has been reached. |
2 节能建筑的评价应在达到适用的室内环境的前提下进行。 |
3907 |
2 Energy saving type master switch shall be set in hotel room; |
2 旅馆客房应设置节电控制型总开关; |
3908 |
2 Energy-efficient construction processes shall be adopted. |
2 应采用能耗少的施工工艺。 |
3909 |
2 Engineering sewage and laboratory curing water shall be treated before being discharged into the municipal sewage pipe. |
2 工程污水和试验室养护用水应经处理达标后排入市政污水管道。 |
3910 |
2 Entrance and path to the toilet shall be convenient for people riding a wheelchair to enter into and turn; the turning diameter shall not be less than 1.50m; |
2 厕所的入口和通道应方便乘轮椅者进入和进行回转,回转直径不小于1.50m; |
3911 |
2 Entrance arranged with steps and wheelchair ramp; |
2 同时设置台阶和轮椅坡道的出入口; |
3912 |
2 Entrance of and indoor space in public bathroom shall be convenient for people riding a wheelchair to enter into and use; the bathroom shall be able to guarantee available turning of the wheelchair inside it and the turning diameter shall not be less than 1.50m; |
2 公共浴室的入口和室内空间应方便乘轮椅者进入和使用,浴室内部应能保证轮椅进行回转,回转直径不小于1.50m; |
3913 |
2 Entrance platform; |
2 入口平台; |
3914 |
2 Environmental investigation shall include the following contents: |
2 环境调查应包括下列内容: |
3915 |
2 Equation (D. 3.2-1) may be rewritten as follows if the performance X follows logarithmic normal distribution: |
2 当性能X服从对数正态分布时,式(D.3.2-1)可改写为: |