3816 |
2 Complete records of construction operation basis and quality inspection shall be kept. |
2 应具有完整的施工操作依据、质量检查记录。 |
3817 |
2 Completed construction operation basis and quality inspection records shall be provided. |
2 应具有完整的施工操作依据、质量检查记录。 |
3818 |
2 Completion acceptance report of building energy efficient engineering; |
2 建筑节能工程竣工验收报告; |
3819 |
2 Compliance control (acceptance): acceptance inspection shall be carried out for materials and members according to relevant quality control standard before putting into service for ensuring the quality meets the requirement. |
2 合格控制(验收):在交付使用前,应根据规定的质量验收标准,对材料和构件进行合格性验收,保证其质量符合要求。 |
3820 |
2 Composite sandwich plate with metal covers; |
2 金属面复合夹芯板; |
3821 |
2 Concrete delivered to the site should be directly loaded into the dollies for conveying and the dollies should be loaded near the lifting equipment. |
2 运输至施工现场的混凝土宜直接装入小车进行输送,小车宜在靠近升降设备的位置进行装料。 |
3822 |
2 Concrete perforated brick and concrete solid brick should not be wetted but in dry and hot climate, they should be wetted before masonry; |
2 混凝土多孔砖及混凝土实心砖不宜浇水湿润,但在气候干燥炎热的情况下,宜在砌筑前对其浇水湿润; |
3823 |
2 Concrete strength of precast members, and type, specification and quantity of precast members, connections and fittings; |
2 预制构件的混凝土强度,预制构件、连接件及配件的型号、规格和数量; |
3824 |
2 Concreting with conveying pipe should be from far to near; placements with multiple conveying pipes should be at the same speed; |
2 采用输送管浇筑混凝土时,宜由远而近浇筑;采用多根输送管同时浇筑时,其浇筑速度宜保持一致; |
3825 |
2 Conditioned rooms are scattered; |
2 需设空气调节的房间布置分散; |