3215 |
15.1.4 At the beginning of welding procedure of strengthening steel members with enlarged section, the air temperature requirements of construction sites shall comply with those specified in Article 16.1.3 of this code. |
15.1.4 钢构件增大截面工程进入焊接工序时,其施工现场的气温要求应按本规范第16.1.3条的规定执行。 |
3216 |
15.1.4 The adopted monitoring instrument and equipment shall meet the data accuracy requirement and guarantee the data stability and accuracy; the sensors with high sensitivity, good corrosion resistance, strong electromagnetic wave interference resistance, small volume and light weight should be adopted. |
15.1.4 采用的监测仪器和设备应满足数据精度要求,且应保证数据稳定和准确,宜采用灵敏度高、抗腐蚀性好、抗电磁波干扰强、体积小、重量轻的传感器。 |
3217 |
15.1.4 The connectivity of communication channels applied for the ATP system shall be inspected before commissioning of the ATP system. |
15.1.4 ATP系统调试前应检查系统所使用的通信通道畅通。 |
3218 |
15.1.5 ATP system must meet the fail-safe principle. |
15.1.5 ATP系统必须符合故障导向安全原则。 |
3219 |
15.1.5 Strengthening steel members with enlarged section under load conditions shall be required tocarry out by professional organization with corresponding technical grade qualification; the welding operation must be conducted by the welder who has obtained the corresponding position welding quality certificate and passed on-site evaluation. |
15.1.5 负荷状态下钢构件增大截面工程,应要求由具有相应技术等级资质的专业单位进行施工;其焊接作业必须由取得相应位置施焊的焊接合格证、且经过现场考核合格的焊工施焊。 |
3220 |
15.2 ATP System Function Inspection |
15.2 列车自动防护系统功能检验 |
3221 |
15.2 Construction Monitoring |
15.2 施工监测 |
3222 |
15.2 Installation of Hardware and Software |
15.2 硬件和软件安装 |
3223 |
15.2 Interface Treatment |
15.2 界面处理 |
3224 |
15.2.1 After derusting and finishing, the surfaces of the strengthening part of the existing structures and members shall show metallic luster and be free from obvious concave or damage; if scratch exists, its depth shall not be greater than 0.5mm. |
15.2.1 原结构、构件的加固部位经除锈和修整后,其表面应显露出金属光泽,且不应有明显的凹面或损伤;若有划痕,其深度不得大于0.5mm。 |