3005 |
13.6.7 The coating of fire-retardant coating layer shall be carried out in layers; after the previous coating is dry or cured, the construction for the next coating is carried out. |
13.6.7 防火涂料涂装施工应分层施工,应在上层涂层干燥或固化后,再进行下道涂层施工。 |
3006 |
13.6.8 Under one of the following conditions, respray or repair coating shall be carried out for the thick fire-retardant coating layer: |
13.6.8 厚涂型防火涂料有下列情况之一时,应重新喷涂或补涂: |
3007 |
13.6.9 Construction of thin fire-retardant coating surface layer shall meet the following requirements: |
13.6.9 薄涂型防火涂料面层涂装施工应符合下列规定: |
3008 |
14 Before the switchboard is power on, the following contents shall be inspected: |
14 交换机设备通电前,应对下列内容进行检查: |
3009 |
14 CJ 266 Safety Regulations for Cold Potable Water Meters |
14 《饮用水冷水水表安全规则》CJ 266 |
3010 |
14 CJ/T 164 Domestic Water Saving Devices |
14 《节水型生活用水器具》 CJ/T 164 |
3011 |
14 Computer Monitoring |
14 微机监测 |
3012 |
14 Construction Survey |
14 施工测量 |
3013 |
14 GB 14902 Ready-mixed Concrete |
14 《预拌混凝土》 GB 14902 |
3014 |
14 GB 199 Rapid Harding Portland Cement |
14 《快硬硅酸盐水泥》GB 199 |