2975 |
13.4.2 Welding environment shall meet the relevant requirements of the current national standard GB 50661 Code for Welding of Steel Structures. |
13.4.2 焊接作业环境应符合现行国家标准《钢结构焊接规范》GB 50661的有关规定。 |
2976 |
13.4.3 Coverage area of mesh shall be determined according to area of cracks or weathered and denuded parts, in addition, anchorage length of mesh shall be considered. |
13.4.3 网片覆盖面积除应按裂缝或风化、剥蚀部分的面积确定外,尚应考虑网片的锚固长度。 |
2977 |
13.4.3 Metal hot spraying shall meet the following requirements: |
13.4.3 金属热喷涂施工应符合下列规定: |
2978 |
13.4.3 Non-destructive testing for welds shall be conducted according to the requirements of current national standard GB/T 11345 Non-destructive Testing of Welds-Ultrasonic Testing-Techniques, Testing Levels, and Assessment and JG/T 203 Method for Ultrasonic Testing andClassification for Steel Structures. |
13.4.3 焊缝无损探伤应按国家现行标准《焊缝无损检测 超声检测 技术、检测等级和评定》GB/T 11345和《钢结构超声波探伤及质量分级法》JG/T 203的规定进行探伤。 |
2979 |
13.4.3 Normal tensile bonding strength between motor layers and substrate must be carried out with evidential sampling inspection. |
13.4.3 砂浆面层与基材之间的正拉粘结强度,必须进行见证取样检验。 |
2980 |
13.4.4 As for welds rejected by testing inspection, not only rejected positions shall be subjected to repair, but also be doubled for re-inspection. If they fail to pass the re-inspection, 100% testing inspection shall be conducted for these welds. |
13.4.4 经探伤检验不合格的焊缝,除应将不合格部位的焊缝返修外,尚应加倍进行复检;当复检仍不合格时,应将该焊缝进行100%探伤检查。 |
2981 |
13.4.4 For the sealant for the metal hot spraying layer or the coating of the first pass of sealing paints, brush method should be adopted; and the construction process shall meet requirements of Section 13.3 in this Code. |
13.4.4 金属热喷涂层的封闭剂或首道封闭油漆施工宜采用涂刷方式施工,施工工艺要求应符合本规范第13.3节的规定。 |
2982 |
13.4.4 Thickness testing on steel bar protective layers of the new-added motor layers may adopt partial-chiseling inspection or non-damaged detection. |
13.4.4 新加砂浆面层的钢筋保护层厚度检测,可采用局部凿开检查法或非破损探测法。 |
2983 |
13.4.5 Where planted bars or anchor bolt steel is adopt to tie bar meshes, inspection of construction quality shall be carried out in advance respectively according to the provisions specified in Chapter 19 and Chapter 20 of this code as well as the acceptance requirements of concealed works. |
13.4.5 当采用植筋或锚栓拉结钢筋网时,应在其施工完毕后,分别按本规范第19章和第20章的规定,以及隐蔽工程的验收要求提前进行施工质量检验。 |
2984 |
13.4.6 The appearance of motor layers for masonry or concrete members and steel bar meshes should be free from common defects. |
13.4.6 砌体或混凝土构件外加钢筋网的砂浆面层,其外观质量不宜有一般缺陷。 |