2855 13 In the areas with multiple energy resources, combined energy may be adopted for cooling and heating. 13 具有多种能源的地区,可采用复合式能源供冷、供热。
2856 13 Interlocking 13 联锁
2857 13 JGJ/T 163 Code for Lighting Design of Urban Nightscape 13 《城市夜景照明设计规范》 JGJ/T 163
2858 13 Masonry Crack Repairing 13 砌体裂缝修补法
2859 13 Non-galvanized steel pipe shall be adopted sleeve pipe welding, and the sleeve pipe length shall be 1.5~3.0 times of the pipe diameter; 13 非镀锌钢管应采套管焊接,套管长度应为管径的1.5倍~3.0倍;
2860 13 Strengthening Concrete or Masonry Members by Steel Bar Mesh and Motor Layer 13 砌体或混凝土构件外加钢筋网—砂浆面层工程
2861 13 The AC power line used in the switching system shall be provided with protective grounding wire; 13 交换系统用的交流电源线应有保护接地线;
2862 13 The power line shall be avoided being tramped, pulled or dragged. 13 应避免践踏和拉拽电源线。
2863 13 Wave force; 13 波浪力;
2864 13) If any damage exists in optical fiber composite overhead ground wire and installation quality of down lead and conjunction box. 13)光纤复合架空地线有否受损,引下线及接续盒的安装质量。