ID |
原文 |
译文 |
2855 |
13 In the areas with multiple energy resources, combined energy may be adopted for cooling and heating. |
13 具有多种能源的地区,可采用复合式能源供冷、供热。 |
2856 |
13 Interlocking |
13 联锁 |
2857 |
13 JGJ/T 163 Code for Lighting Design of Urban Nightscape |
13 《城市夜景照明设计规范》 JGJ/T 163 |
2858 |
13 Masonry Crack Repairing |
13 砌体裂缝修补法 |
2859 |
13 Non-galvanized steel pipe shall be adopted sleeve pipe welding, and the sleeve pipe length shall be 1.5~3.0 times of the pipe diameter; |
13 非镀锌钢管应采套管焊接,套管长度应为管径的1.5倍~3.0倍; |
2860 |
13 Strengthening Concrete or Masonry Members by Steel Bar Mesh and Motor Layer |
13 砌体或混凝土构件外加钢筋网—砂浆面层工程 |
2861 |
13 The AC power line used in the switching system shall be provided with protective grounding wire; |
13 交换系统用的交流电源线应有保护接地线; |
2862 |
13 The power line shall be avoided being tramped, pulled or dragged. |
13 应避免践踏和拉拽电源线。 |
2863 |
13 Wave force; |
13 波浪力; |
2864 |
13) If any damage exists in optical fiber composite overhead ground wire and installation quality of down lead and conjunction box. |
13)光纤复合架空地线有否受损,引下线及接续盒的安装质量。 |