ID |
原文 |
译文 |
2705 |
12.1.8 Materials shall not be stacked within 2.0m of the edge of foundation trench or pit; where materials are stacked beyond 2.0m, the stacking height shall not be greater than 1.5m. |
12.1.8 距基槽或基坑边沿2.0m 以内不得堆放物料;当在2.0m以外堆放物料时,堆置高度不应大于1.5m。 |
2706 |
12.1.8 One of the following methods may be adopted for connection between steel tie rod and external reinforced concrete ring beam: |
12.1.8 钢拉杆与外加钢筋混凝土圈梁可采用下列方法之一进行连接: |
2707 |
12.1.9 Before foundation masonry, the stability of side slopes of foundation pit and trench shall be inspected carefully; where collapse danger exists or the support is unfirm, reliable measures shall be taken. |
12.1.9 基础砌筑前应仔细检查基坑和基槽边坡的稳定性,当有塌方危险或支撑不牢固时,应釆取可靠措施。 |
2708 |
12.1.9 The specification for angle ring beam shall not be less than L80mm×6mm or L75mm×6mm; the angle ring beam shall be tied to the wall with ordinary bolt every other 1m~1.5m; and the diameter of screw rod shall be greater than or equal to 12mm. |
12.1.9 角钢圈梁的规格不应小于∟80mm×6mm或∟75mm×6mm,并应每隔1m~1.5m,与墙体用普通螺栓拉结,螺杆直径不应小于12mm。 |
2709 |
12.2 Design of Fire Resistance |
12.2 防火设计 |
2710 |
12.2 Environmental Protection |
12.2 环境保护 |
2711 |
12.2 Equipment Installation |
12.2 设备安装 |
2712 |
12.2 Equipment Marking |
12.2 设备标识 |
2713 |
12.2 Interface Treatment |
12.2 界面处理 |
2714 |
12.2 Strengthening with Adding Constructional Column |
12.2 增设构造柱加固 |