2595 |
11.5.8 The technical personnel of the users organization shall get involved in the function test and performance test. |
11.5.8 用户单位技术人员应参与功能测试和性能测试。 |
2596 |
11.6 Multi-story and Tall Steel Structures |
11.6 多层、高层钢结构 |
2597 |
11.6 Self-examination and Test |
11.6 自检自验 |
2598 |
11.6.1 Multiple assembly line sections should be divided for installation of the multi-story and tall steel structures with each section of framework as the unit. |
11.6.1 多层及高层钢结构宜划分多个流水作业段进行安装,流水段宜以每节框架为单位。 |
2599 |
11.6.1 The application software of the system shall be detected, and the test records and test reports shall be finished. |
11.6.1 系统的应用软件应进行检测,并完成检测记录和检测报告。 |
2600 |
11.6.2 Hoisting of the member within the assembly line sections should meet the following requirements: |
11.6.2 流水作业段内的构件吊装宜符合下列规定: |
2601 |
11.6.2 The system shall be subjected to network security detection, and the test records and test reports of the network security system shall be finished. |
11.6.2 系统应进行网络安全检测,并完成网络安全系统的检测记录和检测报告。 |
2602 |
11.6.3 Documents for configuration plan and instructions of the equipment and software shall be complete. |
11.6.3 设备及软件的配置方案和配置说明文档应齐全。 |
2603 |
11.6.3 Installation calibration of the multi-story and tall steel structures shall be carried out according to the reference column and shall meet the following requirements: |
11.6.3 多层及高层钢结构安装校正应依据基准柱进行,并应符合下列规定: |
2604 |
11.6.4 After system test, all tested users and tested data shall be deleted. |
11.6.4 系统检验后应将所有测试用户和测试数据删除。 |