ID |
原文 |
译文 |
2485 |
11.2 Construction Preparation |
11.2 施工准备 |
2486 |
11.2 Construction Requirements |
11.2 构造规定 |
2487 |
11.2 Environmental Considerations |
11.2 环境因素控制 |
2488 |
11.2 Evaluation Process |
11.2 评价程序 |
2489 |
11.2 Hoisting Equipment and Hoisting Mechanism |
11.2 起重设备和吊具 |
2490 |
11.2 Installation |
11.2 安装 |
2491 |
11.2 Interface Treatment |
11.2 界面处理 |
2492 |
11.2 Isolation and Heat Preservation |
11.2 保温与隔热 |
2493 |
11.2 Rain Construction |
11.2 雨期施工 |
2494 |
11.2.1 Approved products such as tower crane, crawler crane and auto-crane should be adopted for the installation of steel structures. |
11.2.1 钢结构安装宜采用塔式起重机、履带吊、汽车吊等定型产品。 |