ID 原文 译文
2395 11 Strengthening by Bonding Steel Plates 11 外粘钢板工程
2396 11 Strengthening with Adding Masonry Counterfort Column 11 增设砌体扶壁柱加固法
2397 11 The normally uncharged metal parts such as the enclosure, instrument box, cable trough, support and pedestal of the power using instrument shall be provided with protective grounding; 11 用电仪表的外壳、仪表箱和电缆槽、支架、底座等正常不带电的金属部分,均应做保护接地;
2398 11 The thickness of concrete cover for the main rebars in cast-in-situ piles shall not be less than 50mm; that of the precast piles shall not be less than 45mm and that of the prestress pile shall not be less than 35mm; that of the cast-in-situ piles in the corrosive environment shall not be less than 55mm. 11 灌注桩主筋混凝土保护层厚度不应小于50mm;预制桩不应小于45mm,预应力管桩不应小于35mm;腐蚀环境中的灌注桩不应小于55mm。
2399 11 Use and Maintenance 11 使用与维护
2400 11 Water pressure at different water levels; 11 水位变化的水压力;
2401 11 When the hardware equipment is working, its enclosure shall not be opened; 11 硬件设备工作时不得打开设备外壳;
2402 11 Where the wire pipe passes through the deformation joint of building, it shall be set with compensation device; 11 配管通过建筑物的变形缝时,应设置补偿装置;
2403 11 Winter and Rain Construction 11 冬期与雨期施工
2404 11) Mortar seam thickness; 11)灰缝厚度;