ID |
原文 |
译文 |
2385 |
11 GB/T 223 Methods for Chemical Analysis of Iron, Steel and Alloy |
11 《钢铁及合金化学分析方法》 GB/T 223 |
2386 |
11 Implementation scheme and acceptance record of significant quality and technical problems; |
11 重大质量、技术问题实施方案及验收记录; |
2387 |
11 In hot summer and cold winter zones, water-deficient areas, air source heat pump or soil source and ground source heat pump system is suggested to be adopted for cooling and heating in medium-and small-sized buildings. |
11 夏热冬冷地区以及干旱缺水地区的中、小型建筑宜采用空气源热泵或土壤源地源热泵系统供冷、供热。 |
2388 |
11 In pile foundation design, the interaction among piles, soil and cap shall be considered in combination with local experience. |
11 桩基设计时,应结合地区经验考虑桩、土、承台的共同工作。 |
2389 |
11 Information Application System |
11 信息化应用系统 |
2390 |
11 Installation of Steel Structures |
11 钢结构安装 |
2391 |
11 JGJ 203 Technical Code for Application of Solar Photovoltaic System of Civil Buildings |
11 《民用建筑太阳能光伏系统应用技术规范》 JGJ 203 |
2392 |
11 Other necessary requirements. |
11 其他必要的规定。 |
2393 |
11 Public bathroom shall meet the relevant requirements Section 3.10 of this code; bathroom or bathtub in the bedroom shall be arranged with grab bar and meet the requirements of Articles 3.10.2 and 3.10.3 of this code; |
11 公共浴室应满足本规范第3.10节的有关规定;居室内的淋浴间或盆浴间应设置安全抓杆,并符合本规范第3.10.2及3.10.3条的有关规定; |
2394 |
11 Stairs or steps sinking. |
11 梯级或踏板下陷。 |