2315 10.3.8 Settlement and deformation observation shall be carried out during both construction periodand serviceability period for the following buildings: 10.3.8 下列建筑物应在施工期间及使用期间进行沉降变形观测:
2316 10.3.9 For engineering required to accumulate settlement experience of buildings or subjected to back analysis design, observation of building settlement and monitoring of foundation base reaction shall be carried out. For settlement observation, layered settlement monitoring point should be arranged at the same time. 10.3.9 需要积累建筑物沉降经验或进行设计反分析的工程,应进行建筑物沉降观测和基础反力监测。沉降观测宜同时设分层沉降监测点。
2317 10.4 Construction Requirements 10.4 构造规定
2318 10.4 Inspection of Construction Quality 10.4 施工质量检验
2319 10.4 Rainy Weather Requirements 10.4 雨期施工
2320 10.4 System Debugging 10.4 系统调试
2321 10.4 Wall Test 10.4 墙体试验
2322 10.4.1 During construction in rainy weather, water-proof and moisture-proof measures shall be taken for cement and mineral admixtures and the moisture content of coarse and fine aggregates shall be monitored in order to adjust the mix proportioning in time. 10.4.1 雨期施工期间,水泥和矿物掺合料应采取防水和防潮措施,并应对粗骨料、细骨料的含水率进行监测,及时调整混凝土配合比。
2323 10.4.1 The bond quality between the fiber reinforced polymer (FRP) and the concrete may be inspected by hammering method or other effective detecting methods. 10.4.1 纤维复合材与混凝土之间的粘结质量可用锤击法或其他有效探测法进行检查。
2324 10.4.1 The debugging preparation shall meet the following requirements: 10.4.1 调试准备应符合下列规定: