ID |
原文 |
译文 |
2045 |
10 When threading in the line passing box that is nearest to the information point, a surplus no less than 0.15 mm should be reserved. |
10 距信息点最近的一个过线盒穿线时应宜留有不小于0.15mm的余量。 |
2046 |
10 Wire Rope Mesh-Polymer Modified Cement Mortar Layer Strengthening |
10 钢丝绳网-聚合物改性水泥砂浆面层加固法 |
2047 |
10) Conductor transposition situation; |
10)导线换位情况; |
2048 |
10) Overlapping construction length of masonry block; |
10)砌块搭砌长度; |
2049 |
10) Straightness of horizontal mortar seam; |
10)水平灰缝平直度; |
2050 |
10) T-seam misalignment of dry wall. |
10)清水墙游丁走缝。 |
2051 |
10. Add the design requirements that the minimum ratio of reinforcement of spread foundation shall not be less than 0.15%; |
10.增加扩展基础最小配筋率不应小于0.15%的设计要求; |
2052 |
10. The Comparative Study on the Suitability of FIDIC Contract Conditions |
10. FIDIC合同条件适用性问题比较研究 |
2053 |
10. The expression and table for the gust factor are amended. |
10.修改了阵风系数的计算公式与表格; |
2054 |
10.0.1 As for the green construction project, self-evaluation shall not be less than 1 time per month and not be less than 1 time per stage. |
10.0.1 绿色施工项目自评价次数每月不应少于1次,且每阶段不应少于1次。 |