◆ in a truss, the bars are joined together by hinges at all the connections; ◆ in frames, all the joints are fixed and entirely stiff. |
平面桁架和框架 平面桁架和框架是位于平面内的平面结构(见图9.1)。 |
106773 |
◆ indirect costs of loss—inability to meet contracts, loss of market share, loss of goodwill, poor industrial relations, poor workplace morale, recruitment problems, adverse press relationship. Risk Management |
◆ 损失的间接成本——无能力履行合同,市场份额的损失,声誉的损失,劳资关系变差,工作士气变差,招募新职员问题,不利的压力关系。 |
106774 |
◆ industrial—warehouses, factories, land in industrial districts, and power plants; |
◆ 工业地产——仓库,工厂,工业区用地和发电厂; |
106775 |
◆ instil confidence in the project, in third parties, and in the project team itself; |
◆ 在项目,第三方以及项目团队中渗透信心; |
106776 |
◆ job safety standards; |
◆ 工作安全标准; |
106777 |
◆ latent defects occurring in the structure through poor workmanship; |
◆ 操作工艺低劣导致结构存在潜在的缺陷; |
106778 |
◆ measurable consequential costs of loss—loss of, or reduced output, knock-on effect on production chain, losses whilst retraining replacement staff or becoming familiar with replacement equipment, accident investigation costs, lost management time involved in litigation, increased premiums; |
◆ 损失产生的可测量间接成本——产量的损失或减少,对生产线的冲击作用,损失所带来的新职员的再培训,熟悉替换设备,事故调查成本,参与诉讼损失的管理时间以及增加的额外费用。 |
106779 |
◆ order of magnitude estimates |
◆ 初步估算; |
106780 |
◆ organization of a safety program; |
◆ 安全计划的组织; |
106781 |
◆ promote an uninterrupted progression of the activities within a project and, by implementing the appropriate measures, remove any interruptions as quickly as possible should they occur; |
风险管理可以:◆ 在项目中促进活动不间断的前进,通过执行恰当的措施,在它们发生时尽可能快的消除任何障碍; |