106762 emergency situation procedures; 应急预案;
106763 exceptionally inclement weather delaying the project; 异常的恶劣气候导致工期延误;
106764 failure to complete the project within the client's budget allowance. 未能在业主的预算范围内完成项目;风险的成本
106765 failure to complete within the stipulated design and construction time; 未能按规定的设计和建设工期完成;
106766 failure to let to a tenant upon completion; 项目完成后,未能租出;
106767 failure to obtain the expected outline planning, detailed planning or building code/regulation approvals within the time allowed in the design programme; 在设计阶段未能按时获得总体规划、详细规划或建筑物规范/法规所要求的批准;
106768 fire prevention policies. 防火措施。人员培训
106769 force majeure (flood, earthquake etc.); 不可抗力(洪水、地震等);
106770 good safety behavior should be a condition of continuing employment and considered in annual appraisals; 良好的安全行为是持续雇佣的条件,并且在每年的考核中予以考虑;
106771 hinged supports; (fully) fixed supports. 支承力与支承反力大小相等方向相反。