ID 原文 译文
106752 a method of calculation which identifies activities that have a critical effect on the project duration (hence the terms critical path method and critical path analysis which are sometimes used to describe this technique); 识别对项目工期有重要影响的工序的计算方法(因此关键线路法和关键线路分析有时被用于描述这种技术);
106753 a sense of 'ownership' of safety standards with widespread involvement in the policing and training for safety; 安全标准“主人”感,广泛深入的安全政策和培训投入;
106754 accident reporting requirements; 事故报告的有关要求;
106755 administration of the program; 计划的执行;
106756 agricultural—farms, timberland, ranches, and orchards; 农业地产——农场,林场,牧场和果园;
106757 an accident to an operative on site causing physical injury; 现场操作事故导致人员受伤;
106758 client to contractor; contractor to subcontractor; 承包商转移给分包商
106759 client, contractor, subcontractor or designer to insurer; contractor or subcontractor to surety. 业主、承包商、分包商或者设计单位转移给保险公司
106760 commercial—business property, including office space, shopping centers, stores, theaters, hotels and parking facilities; 商业地产——商业地产,包括写字楼,购物中心,百货店,剧院,宾馆和停车场;
106761 direct costs of loss—repairs or replacement of damaged goods or property, third party compensation; 损失的直接成本——修理或替换毁坏的货物或资产,第三方赔偿。