104060 |
Within 28 days after receiving the Final Statement and written discharge in accordance with Sub-Clause 14.11 [Application for Final Payment Certificate] and Sub-Clause 14.12 [Discharge], the Engineer shall issue, to the Employer, the Final Payment Certificate which shall state: |
根据第14.11款[最终支付证书的申请]和第14.12款[结清单],在收到最终报表及书面结清单单后28天内,工程师应向雇主发出一份最终支付证书,说明: |
104061 |
Within 30 days, the sponsors shall hold and preside over the establishment meeting, which is composed of the subscribers. |
发起人应当在三十日内主持召开公司创立大会。创立大会由认股人组成。 |
104062 |
Within 42 days after receiving a claim or any further particulars supporting a previous claim, or within such other period as may be proposed by the Employer and approved by the Contractor, the Employer shall respond with approval, or with disapproval and detailed comments. |
雇主在收到索赔报告或对过去索赔的任何进一步证明资料后42天内,或在雇主可能建议并经承包商认可的其他期限内,做出回应,表示批准,或不批准并附具体意见。 |
104063 |
Within 42 days after receiving a claim or any further particulars supporting a previous claim, or within such other period as may be proposed by the Engineer and approved by the Contractor, the Engineer shall respond with approval, or with disapproval and detailed comments. |
在收到索赔报告或该索赔的任何进一步的详细证明报告后42天内(或在工程师可能建议且由承包商批准的此类其他时间内),工程师应表示批准或不批准,不批准时要给予详细的评价。 |
104064 |
Within 42 days after the Contractor became aware (or should have become aware) of the event or circumstance giving rise to the claim, or within such other period as may be proposed by the Contractor and approved by the Employer, the Contractor shall send to the Employer a fully detailed claim which includes full supporting particulars of the basis of the claim and of the extension of time and/or additional payment claimed. |
在承包商觉察(或应已觉察)引起索赔的事件或情况后42天内,或在承包商可能建议并经雇主认可的其他期限内,承包商应向雇主递交一份充分详细的索赔报告,包括索赔的依据、要求延长的时间和(或)追加的付款的全部详细资料。 |
104065 |
Within 42 days after the Contractor became aware (or should have become aware) of the event or circumstance giving rise to the claim, or within such other period as may be proposed by the Contractor and approved by the Engineer, the Contractor shall send to the Engineer a fully detailed claim which includes full supporting particulars of the basis of the claim and of the extension of time and/or additional payment claimed. |
在承包商开始注意到,或应该开始注意到,引起索赔的事件或情况之日起42天内,或在承包商可能建议且由工程师批准的此类其他时间内,承包商应向工程师提交一份足够详细的索赔,包括一份完整的证明报告,详细说明索赔的依据以及索赔的工期和(或)索赔的金额。 |
104066 |
Within 5 days from the day when the administrative organ accepts an application, at least 2 functionaries shall be designated to conduct inspection, testing or quarantine according to the technical standards or criteria. |
行政机关实施检验、检测、检疫, 应当自受理申请之日起五日内指派两名以上工作人员按照技术标准、技术规范进行检验、检测、检疫。 |
104067 |
Within 56 days after receiving the Performance Certificate, the Contractor shall submit, to the Employer, six copies of a draft final statement with supporting documents showing in detail in a form approved by the Employer: |
在收到履约证书后56天内,承包商应按照雇主批准的格式,向雇主递交最终报表草案,并附证明文件,一式六份,详细列出: |
104068 |
Within 56 days after receiving the Performance Certificate, the Contractor shall submit, to the Engineer, six copies of a draft final statement with supporting documents showing in detail in a form approved by the Engineer: |
在颁发履约证书56天内,承包商应向工程师提交按其批准的格式编制的最终报表草案一式六份,并附证明文件,详细说明以下内容: |
104069 |
Within 84 days after receiving such reference, or the advance payment referred to in Clause 6 of the Appendix-General Conditions of the Dispute Adjudication Agreement, whichever date is later, or within such other period as may be proposed by the DAB and approved by both Parties, the DAB shall give its decision, which shall be reasoned and shall state that it is given under this Sub-Clause. |
DAB应在收到此项委托、或附录——争端裁决协议书一般条件第6条中提到的预付款额,二者中较晚的日期后84天内,或在可能由DAB建议并经双方认可的此类其他期限内,提出它的决定,决定应是有理由的,并说明是根据本款规定提出的。 |